What we do
Built to last
Four trades under one roof, and a hardware store next to the yard. Sample rates; every job gets a written quote.
- 01
House construction
From the lot to the keys: plans, structure, finishing and turnover.
- One-storey and two-storey homes
- Weekly photo updates on Messenger
- Written quote and schedule up front
from ₱22,000 per sq msample rate - 02
Renovation and extensions
Add a room, open a kitchen, fix the leak for good.
- Second-floor additions
- Kitchens, bathrooms, tiling
- Work planned around your family
from ₱8,000 per sq msample rate - 03
Roofing
Long-span, GI and insulated roofing, installed and sealed.
- Re-roofing and new trusses
- Gutters and flashing
- Typhoon-ready fastening
from ₱650 per sq m installedsample rate - 04
Steel fabrication
Gates, railings, canopies and trusses cut and welded to your plan.
- Gates and fences
- Stair and balcony railings
- Canopies and carports
gates from ₱6,500sample rate
Hardware store
Sample price list
Sample prices only. Prices change with supply: message us for today’s price and stock.
Cement and aggregates
| Portland cement, 40 kg | per bag | ₱265 |
|---|---|---|
| Washed sand | per cu m | ₱1,500 |
| Gravel, 3/4 in | per cu m | ₱1,650 |
| Hollow block (CHB) 4 in | per pc | ₱14 |
| Hollow block (CHB) 6 in | per pc | ₱22 |
Steel
| Rebar 10 mm x 6 m | per pc | ₱230 |
|---|---|---|
| Rebar 12 mm x 6 m | per pc | ₱330 |
| Tie wire | per kg | ₱95 |
| Angle bar 2 x 2 x 6 m | per pc | ₱780 |
| Common nails, 3 in | per kg | ₱90 |
Roofing
| GI corrugated sheet, 8 ft | per sheet | ₱560 |
|---|---|---|
| Long-span roofing | per m | ₱410 |
| Roofing screws, pack of 100 | per pack | ₱180 |
| Ridge roll | per pc | ₱340 |
| Gutter, 10 ft | per pc | ₱520 |
Paint and finish
| Latex paint, white, 4 L | per can | ₱780 |
|---|---|---|
| Plywood 1/2 in, 4 x 8 ft | per sheet | ₱620 |
| Safety helmet | per pc | ₱180 |
| Epoxy primer, 1 L | per can | ₱430 |
| Paint brush set | per set | ₱150 |